随着环保要求的提高,国家环保机构要求大型火电厂烟气净化装置尽量不设旁路烟道。为响应国家政策,现阶段大型火电机组烟气基本采用无旁路烟道的设计方案。论文主要描述取消旁路烟道后对脱硫配电方式的影响。
With the rising of environmental protection requirements, the national environmental protection institute requires that it is best to cancle bypass flue of flue gas purification devices in of large thermal power plant. In order to respond to the national policies, at current stage, in Large Thermal Power Plant, none-bypass gas flue design is commonly adopted. This paper describes the impact on power distribution methods after the bypass gas flue is cancelled.
出处
《工程建设与设计》
2010年第9期86-88,共3页
Construction & Design for Engineering
关键词
脱硫
无旁路烟道
配电方式
desulfurization
none-bypass gas flue
power distribution methods