摘要
新建石家庄南编组站是石家庄货运系统外迁工程的重要组成部分,通过对SAM和CIPS两种编组站综合自动化方案的比较,结合工程进度情况和投资规模,选择了适合的解决方案,为实现信息和控制自动化及减员提效创造了有利条件。
The newly-built South Shijiazhuang marshalling yard is an important part of Shijiazhuang railway transportation system migration project.Through comparing the two integrated automation solutions,e.g.,Synthetic Automation of Marshalling Yard and Computer Integrated Process System,a suitable solution is recommended considering the project progress and investment scale,which provide favorable conditions for achieving integrated automation and improving efficiency.
出处
《铁道通信信号》
2010年第8期26-28,共3页
Railway Signalling & Communication
关键词
铁路编组站
综合自动化
方案
Railway marshalling yard
Integrated automation
Solution