期刊文献+

Utilization Pattern of Olympic Parks and Its Application in Beijing

Utilization Pattern of Olympic Parks and Its Application in Beijing
下载PDF
导出
摘要 With great promotion of mega-events in both quantities and qualities in China, the research of Mega-events has been increased. As a global hallmark event, the Olympics, with their enormous scale, universal at- traction for the media and tremendous political significance, have increasingly drawn attention from the researchers. It is obvious that Beijing has been greatly impacted by the 2008 Olympic Games as the host. The event aroused close attention of researchers, especially the problem how the Olympic stadiums and facilities can be utilized after Olympic Games. The paper employed 3 methods to conduct a survey, that is, sending questionnaires to tourists, in- terviewing with government officers, and collecting information about former Olympic Parks from Internet and literatures. The utilization of former Olympic Parks after Games was summarized and some experiences were refined. Besides, 3 main bodies including government, business operators and visitors which formed basic driving forces to influence the park′s use were analyzed. At the same time, the paper believes that 3 topics affect the park′s utilization involving ′prepare to use′, ′how to use it′ and ′how to manage it′, and Beijing Olympic Park can also follow that thinking and reference in the further practices. Based on it, suggestions are given that Beijing Olympic Park can be planned spatially from 3 layers, the point, line and area, based on their function and infrastructure in the Games, and the area would be shaped as a new urban center with multi-functions while Mega-events and sport events are still the main content of the park. With great promotion of mega-events in both quantities and qualities in China, the research of Mega-events has been increased. As a global hallmark event, the Olympics, with their enormous scale, universal attraction for the media and tremendous political significance, have increasingly drawn attention from the researchers. It is obvious that Beijing has been greatly impacted by the 2008 Olympic Games as the host. The event aroused close attention of researchers, especially the problem how the Olympic stadiums and facilities can be utilized after Olympic Games. The paper employed 3 methods to conduct a survey, that is, sending questionnaires to tourists, in- terviewing with government officers, and collecting information about former Olympic Parks from Intemet and lit- eratures. The utilization of former Olympic Parks after Games was summarized and some experiences were refined. Besides, 3 main bodies including government, business operators and visitors which formed basic driving forces to influence the park's use were analyzed. At the same time, the paper believes that 3 topics affect the park's utilization involving 'prepare to use', ~how to use it' and ~how to manage it', and Beijing Olympic Park can also follow that thinking and reference in the ft^her practices. Based on it, suggestions are given that Beijing Olympic Park can be planned spatially from 3 layers, the point, line and area, based on their function and infrastructure in the Games, and the area would be shaped as a new urban center with multi-functions while Mega-events and sport events are still the main content of the park.
出处 《Chinese Geographical Science》 SCIE CSCD 2010年第5期414-422,共9页 中国地理科学(英文版)
基金 Under the auspices of Beijing Municipal Science & Technology Commission(No.ZZ0935)
关键词 奥林匹克公园 北京 2008年奥运会 利用模式 基础设施 应用 奥运公园 政府官员 sustainable utilization Olympic Park (Olympic Green) Beijing Olympic Park Beijing
  • 相关文献

参考文献2

二级参考文献75

共引文献201

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部