摘要
介绍了三峡电站发电机组配置的基本概况。对已签订采购合同的左岸电站发电机—变压器组保护方案及功能配置作了详细说明,对中标公司部分保护装置的原理作了相应的介绍,并描述了三峡电站发电机—变压器组保护系统的特点。
The disposition of generator-transformer set for Three Gorges project is briefed. The scheme and configuration of generator-transformer relay protection system, for which contract has been signed, for Three Gorges Left Bank Power Station, are emphasized. Moreover, this paper introduces the principles of partial protective relaying of the corporation of the successful bidder, and presents the characteristics of generator-transformer relay protection system for Three Gorges project.
出处
《电力系统自动化》
EI
CSCD
北大核心
1999年第11期22-25,60,共5页
Automation of Electric Power Systems
关键词
三峡工程
发电机
变压器组
继电保护设备
Three Gorges project generator-transformer set main protection plan disposition