摘要
概括介绍了京沪高速铁路对高速列车性能的要求,提出仅通过摆式列车和线路改造不能满足新世纪对京沪通道发展的要求。
The article generally describes requirements on performance of high-speed trains to be run on the Beijing - Shanghai Highspeed Railway, and puts forward that only through tilting train and track-rehabilitation will not be able to meet the demand by the Beijing - Shanghai corridor development in the new century.
出处
《中国铁路》
1999年第6期39-41,共3页
China Railway
关键词
摆式列车
高速列车
高速铁路
京沪线
tilting train, high-speed train, the Beijing - Shanghai High-speed Railway