期刊文献+

基于AHP的建筑废料分类回收方案决策方法研究 被引量:4

AHP-Based Decision Method for Sorting and Recycling of the Construction and Demolition Waste
下载PDF
导出
摘要 建筑废料分类回收是建筑废料管理计划中的关键环节和工作内容。为了研究废料回收方案的决策问题,文章通过对各项影响因素的系统综合分析,运用层次分析法构建建筑废料分类回收方案的决策模型,并借助Expert Choice软件进行快速的计算从而实现方案优选。研究证明,层次分析法和Expert Choice软件运用于建筑废料分类回收方案决策问题的研究是可行的,结果是合理的。在现场分类回收的双通道直接回收方案、单通道直接回收方案和集中式回收方案中以双通道的直接分类方式为最优;在场外分类回收方式相对于现场方式的比较需要从经济性角度做进一步的研究。 Sorting and recycling of the construction and demolition waste(CD waste) are the key activities for the CD waste management planning.The study used the Analytical Hierarchy Process(AHP) method to construct a decision system for the CD waste sorting and recycling alternatives with the Expert Choice software,which is proved to be effective.The research shows that the alternatives of direct on-site recycling with two refuse chutes is the best among three on-site sorting and recycling alternatives,the other two alternatives of which are direct sorting with two refuse chutes,and direct sorting with on refuse chute and central sorting and recycling.It needs a further study for the off-site method in terms of the economic aspect compared with the on-site methods.
出处 《工程管理学报》 2010年第4期378-382,共5页 Journal of Engineering Management
关键词 建筑废料 分类回收 决策系统 层次分析法 EXPERT CHOICE construction and demolition waste(C&D waste) sorting and recycling decision system Analytical Hierarchy Process(AHP) Expert Choice
  • 相关文献

参考文献8

二级参考文献32

  • 1张二伟,李启明.设计—施工总承包建设项目的风险管理[J].建筑管理现代化,2004,18(3):8-11. 被引量:15
  • 2SHENL.Y.,吴宇哲,CHANE.H.W.,HAOJ.L..Application of system dynamics for assessment of sustainable performance of construction projects[J].Journal of Zhejiang University-Science A(Applied Physics & Engineering),2005,6(4):339-349. 被引量:10
  • 3王孟钧,彭彪,陈辉华.基于系统动力学的建筑市场信用系统[J].系统工程理论方法应用,2006,15(5):409-411. 被引量:14
  • 4毛和瑞,萧元星.基于层次分析的决策支持系统[J].系统工程与电子技术,1996,18(7):15-20. 被引量:7
  • 5[1]吴元炜.绿色建筑发展前景[EB/OL]. http://www.zhb.gov.cn,2003-10-8.
  • 6[4]Vivian W Y Tam,Tam C M, Shen L Y, et al. Wastage Generation on Conventional Insitu and Prefabrication Construction Methods[A]. Proceedion of CRICM 2003 International Research Symposium[C]. Macao:The Chinese Research of Construction Management,2003.285-289.
  • 7[5]Poon C S. Management and recycling of demoli-tion waste in Hong Kong[J]. Waste Management & Research, 1997,15:561-572.
  • 8[6]McDonald B. RECON Waste Minimization and Environmental Program[A]. Proceeding of CIB Commission Meetings and Presentations[C]. Melbourne:RMIT, 1996. 14-16.
  • 9[7]Chun L P, Domenic E S, Charles J K. Strategies for successful construction and demolition waste recycling operations[J]. Journal of Construction Management and Economics, 1997,15:49-58.
  • 10[8]Faniran O O, Caban G. Minimizing waste on construction project sites[J]. Engineering Construction and Architectural Management,1998,(5):182-188.

共引文献41

同被引文献31

  • 1王家远,康香萍,申立银,谭颖恩.建筑废料减量化管理措施研究[J].华中科技大学学报(城市科学版),2004,21(3):26-28. 被引量:18
  • 2刘俊娥,刘敬严,王卫刚.基于AHP的工程承包风险模糊综合评价[J].建筑管理现代化,2005,19(5):9-12. 被引量:13
  • 3王志宪,林丽,虞孝感.循环经济发展指标体系设置与评价——以南京市为例[J].城市问题,2006(4):17-21. 被引量:19
  • 4Boser R A, E1-Gafy M. Accelerating waste minimization in residential construction: a source separation case study [J]. International Journal of Construction Education and Research, 2011, 7(1): 58-70.
  • 5PoonCS, YuATW, WongSW,etal. Management of construction waste in public housing projects in Hong Kong [ J ]. Construction Management and Economics, 2004, 22(9) :675-689.
  • 6Wang J, Yuan H, Kang X, et aI. Critical success factors for on-site sorting of construction waste: a China study [ J ]. Resources, Conservation and Recycling, 2010, 54 : 931-936.
  • 7Poon C S, Yu A T W, Ng L H. On-site sorting of con- struction and demolition waste in Hong Kong [ J ]. Resources, Conservation and Recycling, 2001, 32 (2) : 157-172.
  • 8Lu M, Poon C S, Wong L C. Application framework for mapping and simulation of waste handling processes in construction[ J]. Journal of Construction Engineering and Management, 2006, 132(11) : 1212-1221.
  • 9Ruiz R, Vazquez-Rodriguez J A. The hybrid flow shop scheduling problem[ J]. European Journal of Operational Research, 2010, 205(1) : 1-18.
  • 10Chen C L, Usher J M, Palanimuthu N. A tabu search based heuristic for a flexible flow line with minimum flow time criterion~ J ]. International Journal of Industrial En- gineering-Theory Applications and Practice, 1998, 5 (2) : 157-168.

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部