期刊文献+

用PMU量测设置V-θ节点的混合动态仿真验证策略 被引量:10

A Hybrid Dynamic Simulation Validation Strategy by Setting V-θ Buses with PMU Data
下载PDF
导出
摘要 利用相量测量单元(PMU)量测数据,通过混合动态仿真校核并改进能量管理系统(EMS)中动态安全分析模型的正确性,是电网控制中心基于PMU的高级应用的重要内容。文中提出一种用PMU量测设置V-θ节点的混合动态仿真验证策略,将PMU实测的V值和θ值不经任何转换直接作为边界节点的给定量,使注入量测信号更直接、更精确。V和θ更能反映系统的动态变化,因此,应用该方法可以更灵敏地发现模型参数误差。以4机双区域系统和某省级电网为例,验证了该方法的有效性,用该方法开发的程序已作为校核工具嵌入电网动态安全稳定预警系统。 The hybrid dynamic simulation method, which combines PMU data with simulation models,can be used for power system simulation validation and parameter calibration purpose. This paper proposes a hybrid dynamic simulation validation strategy by setting V-θ buses with PMU data. It can incorporate field PMU data into simulation system more directly and accurately without any additional models. This method has high sensitivity of boundary power injection to the model parameters. The numerical tests on a four-machine two-area test system and a real provincial power grid demonstrate the validity of the proposed method. A hybrid dynamic simulation program is developed based on the proposed method and has been imbedded into EMS.
出处 《电力系统自动化》 EI CSCD 北大核心 2010年第17期12-16,共5页 Automation of Electric Power Systems
基金 国家重点基础研究发展计划(973计划)资助项目(2004CB217904) 国家电网公司科技项目"离线仿真结果的可信度检验准则"~~
关键词 仿真验证 混合动态仿真 相量测量单元 V-θ节点 simulation validation hybrid dynamic simulation phasor measurement unit(PMU) V-θ bus
  • 相关文献

参考文献10

  • 1KOSTEREV D N, TAYLOR C W, MITTELSTADT W A. Model validation for the August 10, 1996 WSCC system outage. IEEE Trans on Power Systems, 1999, 14(3) : 967- 979.
  • 2贺仁睦.电力系统稳定问题研究的方法论[J].电力系统自动化,1998,22(9):9-12. 被引量:18
  • 3贺仁睦.电网动态实时监控及管理系统的构想[J].电力系统自动化,2002,26(5):1-4. 被引量:42
  • 4HUANG Z, KOSTEREV D, GUTTROMSON R, et al. Model validation with hybrid dynamic simulation// Proceedings of the 2006 IEEE Power Engineering Society General Meeting: Vol 2, June 18-22, 2006, Montreal, Canada.
  • 5HUANG Z, GUTTROMSON R, HAUER J. Large-scale hybrid dynamic simulation employing field measurements// Proceedings of the 2004 IEEE Power Engineering Society General Meeting: Vol 2, June 5 10, 2004, Denver, CO, USA: 1570-1576.
  • 6KOSTEREV D. Hydro turbine-governor model validation in Pacific Northwest. IEEE Trans on Power Systems, 2004, 19(2) : 1144-1149.
  • 7韩冬.大区电网实测负荷建模及仿真验证的研究[D].北京:华北电力大学,2008.
  • 8马进,盛文进,贺仁睦,岳程燕,张进,C. RHETHANZ.基于广域测量系统的电力系统动态仿真验证策略[J].电力系统自动化,2007,31(18):11-15. 被引量:36
  • 9薄博,马进,贺仁睦.基于变阻抗方法的电力系统混合仿真验证策略[J].电力系统自动化,2009,33(6):6-10. 被引量:13
  • 10KUNDUR P. Power system stability and control. New York, NY, USA: McGraw Hill, 1994: 813-814.

二级参考文献24

  • 1马进,王景钢,贺仁睦.电力系统动态仿真的灵敏度分析[J].电力系统自动化,2005,29(17):20-27. 被引量:43
  • 2韩志勇,贺仁睦,徐衍会.由汽轮机压力脉动引发电力系统共振机理的低频振荡研究[J].中国电机工程学报,2005,25(21):14-18. 被引量:59
  • 3高松,贺仁睦,马进,张进.电力系统动态仿真误差评定准则研究[J].电力系统自动化,2006,30(4):6-10. 被引量:39
  • 4KOSTEREV D N, TAYLOR C W, MITTELSTADT W A. Model validation for the August 10, 1996 WSCC system outage. IEEE Trans on Power Systems, 1999, 14(3) : 967-979.
  • 5HUANG Z, GUTTROMSON R, HAUER J. Large-scale hybrid dynamic simulation employing field measurements// Proceedings of the 2004 IEEE Power Engineering Society General Meeting: Vol 2, June 5-10, 2004, Denver, CO, USA: 1570-1576.
  • 6KOSTEREV D. Hydro turbine-governor model validation in pacific northwest. IEEE Trans on Power Systems, 2004, 19(2) : 1144-1149.
  • 7Xu W,IEEE Trans Power Syst,1997年,12卷,3期,1290页
  • 8KOSTEREV D N,TAYLOR C W,MITTELSTADT W A.Model validation for the August 10,1996 WSCC system outage.IEEE Trans on Power Systems,1999,14(3):967-979.
  • 9KUNDUR P.Power system stability and control.New York,NY,USA:McGraw-Hill Inc,1993.
  • 10HISKENS I A,PAI M A.Trajectory sensitivity analysis of hybrid systems.IEEE Trans on Circuits and Systems I,2000,47(2):204-220.

共引文献91

同被引文献142

引证文献10

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部