摘要
从理论和实践阐述了水泥原料立磨初期调试的方法,论述了水泥窑运转后立磨的调试控制要点,对运行中出现的问题进行了分析,并提出了具体的处理方法。
The paper described initial commissioning method of vertical mill for cement raw material from the view of theory and practice, and discussed the controlled points during commissioning of vertical mill after cement kiln running. It also analyzed the problems occurring during operation, and proposed specific treatment approaches.
出处
《矿山机械》
北大核心
2010年第17期88-94,共7页
Mining & Processing Equipment
关键词
原料立磨
安装
初期调试
vertical mill for raw material
installation
initial commissioning