主要结合运城地区电能量采集系统的建设情况,侧重对电能量数据采集的远程通信信道初步研究,分析了采集系统通道的几种通讯方式的区别,说明了在规划、设计阶段,几种通讯方式相结合的选用方案。
Based on the construction of electric energy acquisition system in Yuncheng,a preliminary study is done on remote communication channel for electric energy data aquisition,the differences between several communication ways in the channel of energy acquisition system are analysed,and consequently some combined communication ways are suggested at planning and designing stage.
出处
《山西电力》
2010年第4期20-21,30,共3页
Shanxi Electric Power
关键词
电能量采集
系统
通道建设
electric energy acquisition
system
channel construction