摘要
广东惠州抽水蓄能电站工程施工合同实施过程中,发生了较多的变更,人工、材料价格大幅上涨。通过加强工程变更管理、索赔管理、价差调整、计量与结算管理,有效节省了投资,预计总造价可控制在概算范围内,且较好地保障了发包人、承包人的合同权益,工程进展顺利。
In the construction period of Huizhou Pumped-Storage Power Station, the contracts have more changes, and the prices of labor and materials have substantial raise. By strengthening managements on engineering change, claim, price adjustment, quantity measurement and settlement, the investment is effectively saved, the total costs can be limited in budgets, and the rights and interests of owner and contractor are guaranteed.
出处
《水力发电》
北大核心
2010年第9期12-15,22,共5页
Water Power
关键词
工程施工合同
管理
惠州抽水蓄能电站
construction contract
management
Huizhou Pumped-Storage Power Station