期刊文献+

惠州抽水蓄能电站地下厂房洞室群布置方案研究 被引量:2

Study on the Caverns Layout for Underground Powerhouse of Huizhou Pumped-Storage Power Station
下载PDF
导出
摘要 惠州抽水蓄能电站前期设计工作中,对数量众多的地下厂房洞室群进行了多种组合布置方案的研究,优选后采用了厂房分区布置、其他附属洞室有分有合的布置形式;针对场区发育的控制性断层开展了综合研究,在查明断层的空间分布、性状的基础上,优化调整了地下厂房洞室群及高压隧洞位置。这些研究成果的实施,达到了地下厂房洞室群布置合理、建设灵活、节约投资的目的。 In the preliminary design of Huizhou Pumped-Storage Power Station, different combinations of a large number of underground caverns were studied, and two-powerhouse arrangement was selected after layout optimization. According to the field investigation, there is key fault in proposed arrangement area of caverns. The positions of underground caverns and pressure tunnels were adjusted according to the spatial distribution of the key fault. The adjustment of caverns arrangement will meet the requirements of reasonable layout, flexible excavation and minimum investment.
出处 《水力发电》 北大核心 2010年第9期29-32,共4页 Water Power
关键词 地下厂房洞室群 布置 控制性断层 惠州抽水蓄能电站 caverns for underground powerhouse layout key fault Huizhou Pumped-Storage Power Station
  • 相关文献

同被引文献2

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部