摘要
航运系统是汉江蜀河水电站的重要组成部分,经过布置比较,通航建筑物采用垂直升船机方案。文章主要介绍了蜀河水电站垂直升船机的总体布置、建筑物设计、升船机主体设备、电力拖动与控制、过坝方式及货运量等。
The navigation system is an important part of the Shuhe hydropower project on the Hanjiang River.Through layout comparison,the alternative of vertical ship lift system is adopted for the navigation structure.This paper presents general layout of vertical ship lift,structure design,main equipment of ship lift,electric drive and control,dam-passing method,and freight volume.
出处
《西北水电》
2010年第4期34-37,共4页
Northwest Hydropower
关键词
蜀河
水电站
垂直
升船机
设计
Shuhe hydropower project
vertical ship lift
design