浯溪口水利枢纽整体水工及泥沙模型试验研究 被引量:1

Model test of hydraulics and sediment of Wuxikou hydro-junction
下载PDF
导出
摘要 针对浯溪口水利枢纽进口流态、下游河道消能防冲、电站进口泥沙淤积等问题进行了试验研究,通过缩短电站与低孔上游导墙,将其头部改为半圆形,以及表孔段与左坝段之间的连接挡墙采用扭曲面平顺衔接、表孔消力池内设置消力墩等措施,取得了较好的效果. In view of Wuxikou hydro-junction flow pattern of inlet,energy dissipation and erosion control of downstream channel,as well as silt accumulation of plant intake,tests and analysis are made.By shortening upstream guide wall between plant and bot-tom sluice and modifying the head of guid wall into semi-circular,retaining wall between surface sluice and left dam smooth connection with twisted surface and adding stilling pier at the baffle block,good results are achieved.
出处 《江西水利科技》 2010年第3期188-191,共4页 Jiangxi Hydraulic Science & Technology
关键词 流态 消力墩 消能防冲 泥沙淤积 试验研究 Flow pattern Baffle block Energy dissipation and erosion control Silt accumulation Experiment and study
  • 相关文献

参考文献2

  • 1SL155-95,水工模型试验规程[S].中华人民共和国水利部,1995,7,1-33.
  • 2李建中.水力学[M].西安:陕西科学技术出版社,2002.

共引文献8

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部