摘要
叙述了高炉顶压调节控制系统的作用及实现方法,包括减压阀组及TRT,该系统使高炉生产过程中高炉顶压更加稳定,波动更小,系统响应迅速,工作稳定、可靠,并且提高了TRT的发电量。
The functions and the realization way of the BF top pressure control system are recounted, including pressure reducing valve group and TRT. The system, which is rapid in response, stable and reliable in work, enables BF top pressure more stable, less volatile in the course of production, and increases generating capacity of TRT.
出处
《莱钢科技》
2010年第4期60-61,共2页
Laigang Science & Technology
关键词
高炉顶压
减压阀组
TRT
blast furnace top pressure
pressure reducing valve group
TRT