摘要
综采工作面在回收时遇到特殊地质条件时所采取的非常规方案,有效的缩短了施工时间,保证了施工期间的通风断面,保证了施工安全。为综采设备回收总结了良好的经验,值得推广和应用。
When coming across some special geological conditions, the unconventional program should be adopted in recovering the face of the comprehensive mechanized coal mine. It can effectively abbreviate the time of a construction, guarantee sufficient ventilating cross - section and the security in the course Of a construction. The program sums up many good experiences for recycling the equipment of the comprehensive mechanized coal mining, so it is worthy of promotion and application.
出处
《山东煤炭科技》
2010年第4期120-120,122,共2页
Shandong Coal Science and Technology
关键词
综采设备回
收特殊条件
维护通风断面
equipment recovery special conditions guarantee ven- filating cross -section