期刊文献+

长大管棚在隧道浅埋段的施工技术和质量控制 被引量:4

Construction Technology and Quality Control of Big-long Pipe-roof in Shallowly Buried Section of Tunnel
下载PDF
导出
摘要 结合承朝高速公路长逢沟隧道洞口浅埋段的施工情况,介绍了长大管棚大型机械化施工的施工工艺、技术要点和控制难点,对施工中常见的导向管定位不准、钻孔弯曲侵限等问题进行分析并提出解决办法,为管棚施工质量控制提供了一定的参考。 Combined with the construction of the shallowly buried section at Changfenggou Tunnel entrance in Chengchao Expressway, the construction process, key points of the technology and control difficulties of biglong pipe-roof construction are introduced. Some common problems including guiding pipe position inaccuracy, dr bending are analyzed, and the solutions are also put forward, which provide reference for the quality contro pipe-roof construction ng of
出处 《筑路机械与施工机械化》 北大核心 2010年第9期65-69,共5页 Road Machinery & Construction Mechanization
关键词 隧道浅埋段 长大管棚 机械化施工 质量控制 shallowly buried section of tunnel big-long pipe-roof mechanized construction quality control
  • 相关文献

参考文献5

二级参考文献28

共引文献231

同被引文献33

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部