摘要
南水北调中线水源工程建设方案采取“先引汉、后引江”总体格局,其中三峡水库大宁河补水西线方案是“后引江”的内容之一,介绍了南水北调中线大宁河补水方案与大宁河水电开发规划及主要电站建设前期工作情况,分析了南水北调中线大宁河补水与大宁河水电开发中所共同面临的问题,提出了大宁河补水与大宁河水电开发有机结合的对策。
The scheme of water-source project in the Mid-Route South-to-North Water Transfers Project takes "drawing water from Han River first, Yangtze River then" as its whole framework, in which the scheme of Three Gorges Reservoir Daning River's western water diversion, a part of the "drawing water from Yangtze River then" project. It introduces the scheme of the Mid-Route South-to-North Water Transfers Project from Daning river, the planning of Daning river's hydropower development and its main power station's preliminary work, too. Moreover, it analyzes the common problems that happened both in Daning River's water diversion and in the hydropower development. Finally, the solution to combine the Daning River's water-diversion problems and its hydropower development is proposed in this thesis.
出处
《南水北调与水利科技》
CAS
CSCD
2010年第A02期1-4,共4页
South-to-North Water Transfers and Water Science & Technology
关键词
南水北调
大宁河补水
大宁河水电开发
关系研究
South-to-North Water Transfers Project
water diversion from Daning River
hydropower development of Daning River
the study on relationship