期刊文献+

河北省南水北调配套工程可行性研究阶段测量工作探析

A Review on the Engineering Survey on Feasibility Study Stage in the Conveyance System of South-to-North Water Transfer in Hebei Province
下载PDF
导出
摘要 河北省南水北调配套工程由大型输水干渠、各市供水管渠、平原调蓄工程、地表水厂以及城市供水管网等5部分构成,覆盖河北省京广铁路以东中东部平原,控制总面积约7万km^2。针对工程要求技术新、精度高和大范围、长线路的工程特点,介绍了工程测量的技术设计、新技术的应用、质量策划与控制等内容。 The conveyance system of South-to-North Water Transfer Project is composed of the large water conveyance canals, the municipal water supply pipe ducts, the project of store and allocated water in plain, the surface water works and the municipal water supply network. Covering the east central plain which is the east of Beijing-Guangzhou railway in Hebei Province, the project contains total about 70 thousand km2. This paper focuses on the characteris6cs of engineering requirements for new technology, high accuracy, large-scale and long lines project, and introduces engineering survey of the technical design, application of high technology, quality planning and control, and so on.
作者 武喜庚
出处 《南水北调与水利科技》 CAS CSCD 2010年第A02期10-12,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调配套工程 工程测量 GPS数字测绘 质量控制 the conveyance system of South-to-North Water Transfer Project engineering survey GPS digital mapping quality control
  • 相关文献

参考文献8

  • 1河北省水利水电勘测设计研究院.河北省南水北调配套工程规划(送审稿)[R].天津:河北省水利水电勘测设计研究院,2005.
  • 2河北省水利水电勘测设计研究院.河北省南水北调配套工程可行性研究阶段测量工作大纲[R].天津:河北省水利水电勘测设计研究院,2005.
  • 3SL197-97.水利水电工程测量规范(规划设计阶段)[S].[S].,..
  • 4中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会.国家一二等水准测量规范[S].GB/T 12897-2006.
  • 5GB50026-2007工程测量规范[S].
  • 6GB12898-91,国家三四等水准测量规范[S].
  • 7GB/T18314-2001.全球定位系统(GPS)测量规范[S].[S].,..
  • 8GB/T18316-2001.数字测绘产品检查验收规定和质量评定[S].[S].,..

共引文献553

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部