期刊文献+

浅析优化水库除险加固工程中的溢洪道设计方法 被引量:1

Preliminary Optimized Reservoir of the Spillway Base Reinforcement Engineering Design Method
下载PDF
导出
摘要 在水利工程实施过程中,设计人员常常会对溢洪道的设计采取合理的规划,这是因为此方面的设计对于工程的使用性能有着极为重要的影响。溢洪道设计结果的好坏是每个建筑工程要积极重视的问题。现根据工程实例科学的分析了水库溢洪道设计的相关情况,并对溢洪道设计出现的问题进行总结,这样才能保证所实施的除险加固方式发挥作用,以保证设计方案有效进行。 In water conservancy project implementation process, design of the spillway often designed to take reasonable planning, because this aspect of design for engineering use performance has a very important impact. The results of the spillway design or construction project is to actively problems. Based on the analysis of engineering examples, the scientific design of the spillway reservoir, and the related problems design of the spillway was summarized, such ability assure the base, strengthening way to ensure the design scheme.
作者 钟世华
出处 《南水北调与水利科技》 CAS CSCD 2010年第A02期120-122,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 水库 除险加固 溢洪道 设计 reservoir base reinforcement spillway design
  • 相关文献

参考文献7

二级参考文献2

共引文献106

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部