摘要
在分析泵站自动化系统验收工作中存在的问题及其产生原因的基础上,针对南水北调东线工程的特点,在规范验收程序,严格验收过程,调整验收内容,以及建立实用的验收标准体系等方面进行了一系列研究和探索,并在南水北调东线工程前期泵站自动化系统的建设和验收工作中进行了实践,取得了良好的效果。
It analyzed the problems in pumping station automation system acceptance and its causes. Then it studied and explored the regulating the inspection procedures, strict inspection process, adjusting the acceptance of content, and establish practical acceptance standard system and other aspects considering the characteristics of the East Route of the South-to-North Water Transfer Project. It achieved good results in projects of pre-pumping station automation system construction and inspection work carried out in practice.
出处
《南水北调与水利科技》
CAS
CSCD
2010年第A02期157-159,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
泵站自动化
验收
程序
思考
: pumping station automation
acceptance
procedures
thinking