期刊文献+

垃圾渗滤液与城市污水同步脱氮除碳正交试验 被引量:3

SIMULTANEOUS NITROGEN AND CARBON REMOVAL OF LANDFILL LEACHATE AND URBAN WASTEWATER BY ORTHOGONAL EXPERIMENT
下载PDF
导出
摘要 采用倒置A2/O法同步对垃圾渗滤液与城市污水脱氮除碳。正交试验表明,水力停留时间是影响混合污水脱氮和有机物去除的控制因素;理论最优运行参数为HRT=9 h、ρ(DO)=2 mg.L-1、R=80%r、=200%,该工况下COD、NH3-N和TN的平均去除率分别为77.4%、97.2%和62.4%,出水浓度均可稳定达到城镇污水处理厂污染物排放标准(GB 18918-2002)一级A标准。 Using the technology of nitrogen and carbon removal in the consolidated treatment of landfill leachate and municipal wastewater by reversed A2/O process.The results showed that HRT was the key factor for nitrogen and organic removal efficiency by orthogonal experiment.In conditions of HRT is 9 h,DO 2.0 mg·L-1,R 80%,r 200%,the effect of organic and nitrogen removal achieve the optimal synchronization and the average removal rate of COD,NH3-N,TN are 77.4%,97.2%and 62.4%,meanwhile the effluent concentration could steadily reached the discharge standard of pollutants for municipal wastewater treatment plant A-level standard.
出处 《水处理技术》 CAS CSCD 北大核心 2010年第9期69-72,共4页 Technology of Water Treatment
基金 广州市科技计划项目(2007J1-Q411) 广州大学新苗计划项目(20071002)
关键词 倒置A2/O法 垃圾渗滤液 脱氮 除碳 正交试验 水力停留时间 reversed A2/O process landfill leachate nitrogen removal carbon removal orthogonal experiment hydraulic retention time
  • 相关文献

参考文献12

  • 1Kang K-H, Shin H S,Park H. Characterization of humid substances present in landfill leachates with different landfill ages and its implications[J].Water Res.,2002,36:4023-4032.
  • 2Christensen TH,Kjeldsen P,Bjerg P L,et al. Biogeochemistry of landfill leachate plumes[J].Appl Geochem.,2001,16:659-718.
  • 3Connolly R,Zhao Y, Sun G,et al. Removal ofammoniacal-nitrogen from an artificial landfill leachate in downflow reed beds [J]. Process Biochem.,2004,39:1971 - 1976.
  • 4汪太明,孟凡生,王业耀,王琪.回灌法去除垃圾渗滤液中氨氮的研究[J].工业水处理,2007,27(3):13-15. 被引量:11
  • 5沈耀良,王宝贞,杨铨大,刘润芬,许甫庸.厌氧折流板反应器处理垃圾渗滤混合废水[J].中国给水排水,1999,15(5):10-12. 被引量:77
  • 6何品晶,付强,邵立明,薛俊峰,李国建.渗滤液与城市污水合并处理过程的有机物去除特征[J].环境科学学报,2005,25(7):954-958. 被引量:18
  • 7GoronszyM C. Course notes on intermittently operated activated sludge plants[DJ.Australia:Department of Chemical Engineering, University of Queensland, 1992.
  • 8Ren N Q,Chen Z B,Wang A J,et al.Removal of organic pollutants and analysis of MLSS-COD removal relationship at different HRT in a submerged membrane bioreactor [J].Inter-national Biodeterioration & Biodegradation,2005,55:279-284.
  • 9Shim J K, Yoo I K,Lee Y M. Design and operation consid-erations for wastewater treatment of municipal wastewater [J].Water Research,2002,36:413-420.
  • 10冯兆继,石明岩,莫东华.倒置A^2/O工艺氮平衡与脱氮效率的分析[J].化工环保,2008,28(5):388-390. 被引量:14

二级参考文献27

共引文献111

同被引文献55

引证文献3

二级引证文献11

相关作者