摘要
结合斜沟煤矿选煤厂的设计建设及生产管理经验,在选煤工艺、设备大型化、工艺布置及厂区布局、自动化水平等方面与传统选煤厂相比较,总结和分析出大型选煤厂的工艺特点,探索大型选煤厂管理模式。
Introduces the design, construction and production management experience in Xiegou coal preparation plant, compared with the traditional preparation plant in the respect of preparation technology, equipment large-- scale, process layout, plant layout, automation level, etc. Analyses the technology charac- teristics of large coal preparation plant, explores the management of the large coal preparation plant.
出处
《山西焦煤科技》
2010年第8期41-42,52,共3页
Shanxi Coking Coal Science & Technology
关键词
选煤工艺
大型
管理
检修
Coal preparation technology
Large
Management
Maintenance