桃林口水库建成后对下游沿岸的地下水带来了微量的变化,主要对增设一台1m^3/s微型水轮发电机组解决水库管理局库区厂用电可靠性不高,汛期备用电源问题以及通过增加下游“最小下泄流量”,以改善因修建水库下游断流引发的水环境问题进行了探讨。
After the construction of Taolinkou reservoir, there are some changes in the groundwater of downstream. Through adding a 1m3/s micro generator, it solved the problems of electricity reliability and flood season standby power in the power plant. The flow break in river cause by reservoir construction are alleviated by adding the upstream minimum discharge.
出处
《南水北调与水利科技》
CAS
CSCD
2010年第A01期118-119,共2页
South-to-North Water Transfers and Water Science & Technology
关键词
水库
最小下泄流量
小机组
厂用电
reservoir the minimum discharge micro generator plant power consumption