工程变更贯穿项目管理的全过程,影响工程的造价和工期,是工程项目管理过程中的一个难点和重点。如何对工程变更进行管理,是一项专业性强、涉及面广的工作。在一定程度上反映了建设单位的专业水平、协调和处理现场问题的能力以及工作方法。
The engineering changes run throughout project management, will influence fabrication cost and time limit of the project. It is a difficult point and focal point in the project management. How to manage the engineer changes is a special work as well as involves in broad-spectrum work. It has reflected construction unit's organization's competence level to some certain extent, and it is coordinated and processes the field problem ability as well as the method of work.