摘要
结合工程实例,在充分认识风积沙的工程特性基础上,阐述了风积沙路基的关键施工技术,为风积沙地区合理利用风积沙填筑路基提供了一定的施工经验,进而完善了风积沙路基的施工工艺。
Combining with the project case,based on fully understanding on the engineering features of aeolian sand,it elaborates key construction technologies of aeolian sand subgrade,thus,it has accumulates some construction experience for aeolian sand subgrade filling in aeolian sand regions,furthermore,perfects the construction technology of aeolian sand roadbed.
出处
《山西建筑》
2010年第27期271-272,共2页
Shanxi Architecture
关键词
风积沙
路基填筑
施工技术
aeolian sand
roadbed filling
construction technology