大断面全煤盘区风桥设计与施工 被引量:11

Design and construction of large air crossing in full seam mining block
下载PDF
导出
摘要 对于近水平煤层矿井,一般主要大巷和工作面两巷都布置在煤层中,为解决工作面两巷与盘区大巷平面交叉后的通风和运输问题,必然要构筑风桥。对于大断面全煤盘区风桥的设计和施工,根据煤层条件,提出了煤层内布置风桥的设计方案,确定了锚网+锚索+工字钢对棚+注浆+浇注混凝土综合支护的风桥新型支护方法,为类似条件下的矿井提供了一种大断面全煤盘区风桥设计和施工的新方法。 In the coal mine with flat seams,the mine roadway and the two mining gateways generally would be placed in the seams.In order to solve the ventilation and transportation problems when the two mining gateways and the mine roadway in the mining block were in level crossing,it was necessary to build an air crossing.As for the design and construction of the large cross section full seam air crossing in the mining block,according to the seam conditions,a design plan of the air crossing in placed in the seam was provided and a new support method of the air crossing with the comprehensive steel mesh + anchor+H type steel shield+grouting+pouring concrete support was determined,which could provide the new method of the design and construction for the large cross section full seam air crossing in the mining block with a similar conditions.
作者 陈汉宇
出处 《煤炭工程》 北大核心 2010年第9期25-27,共3页 Coal Engineering
关键词 盘区 大断面全煤风桥 设计方案 mining block full seam large air crossing design plan
  • 相关文献

参考文献8

共引文献18

同被引文献34

引证文献11

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部