期刊文献+

九江港城西港区集装箱码头一期工程方案技术分析及经济比选

Technical Analysis on and Economical Comparison of Two Plans for the Container Terminal Engineering(Phase 1) of the Jiujiang Port West Port District
下载PDF
导出
摘要 码头工程方案的选择除了其结构形式以外,很大程度上取决于工程造价的高低。根据九江港城西港区地形、地质、水文等自然条件,对应总平面布置及装卸工艺方案,对九江港城西港区集装箱码头一期工程码头港工建筑物提出了两个方案,并对其进行技术分析及经济比选,从而综合确定推荐方案。 The choice of the terminal engineering plan is mostly decided by the engineering cost besides its structure form. According to, the topography, geology, hydrology and corresponding plane figure and handling technology plan. This paper puts forward 2 plans for the construction of the Container Terminal ( Phase 1 ) of the Jiujiang Port West Port District. Then it makes technical analysis and economic comparison of them, and has chosen a suitable plan finally.
作者 杨莹
出处 《港口科技》 2010年第8期6-8,共3页 Port Science & Technology
关键词 港口 码头 工程 方案 分析 比选 port terminal engineering plan analyze compare and choose
  • 相关文献

参考文献5

  • 1九江港城西港区集装箱码头一期工程工程初步设计报告[E].2008,12.
  • 2交通部水运工程定额站.沿海港口建设建筑概算预算编制规定[E].交水发[2004]247号.2004.7.
  • 3交通部水运工程定额站.沿海港口水工建筑工程定额[E].交水发[2004]247号.2004.7.
  • 4交通部水运工程定额站.沿海港口水工建筑工程参考定额[E].交水发[2004]247号.2004.7.
  • 5交通部水运工程定额站.水运工程混凝土和砂浆材料用量定额[E].交水发[2004]247号.2004.7.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部