期刊文献+

作战单元防空间歇任务到MLDT转换研究 被引量:3

Research on transformation from combat unit aerial defence interval mission to MLDT
下载PDF
导出
摘要 平均保障延误时间是作战单元保障系统保障能力的重要指标。在分析作战单元防空间歇任务要求的基础上,定义了恢复度函数,并基于作战单元受损装备轻损、中损和重损的比例关系,通过曲线拟合得到了分布函数表达式,以此建立了作战单元防空间歇任务到平均保障延误时间的转换模型,为作战单元其他任务到保障要求的转换提供了思路。最后,以某三个作战单元防空间歇任务为例,对转换模型的任务要求输入参数进行灵敏度分析,结果验证了该转换模型的正确性和实用性。 Mean logistic delay time is an important index of the capability of combat unit support systems.Based on analyzing combat unit aerial defence mission requirement,a maintainability function is defined,and based on the different damage proportions of combat unit materiel damaged,the function expression and transformation model of combat unit aerial defence mission to mean logistic delay time(MLDT) are given,which can be used for the transformation of combat unit other missions.Finally,the practicability of the transformation model is illustrated by an example including three combat units aerial defence missions,and the sensitivity of mission requirement import parameters.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2010年第9期1907-1910,共4页 Systems Engineering and Electronics
基金 国防预研基金(51319060101)资助课题
关键词 作战单元 转换模型 修复度函数 平均保障延误时间 防空间歇任务 combat unit transformation model maintainability function mean logistic delay time(MLDT) aerial defence mission
  • 相关文献

参考文献6

二级参考文献40

  • 1刘春林,何建敏,盛昭瀚.应急系统多出救点选择问题的模糊规划方法[J].管理工程学报,1999,13(4):21-24. 被引量:12
  • 2张悟移,张环.供应链管理方法在产业集群构建中的应用[J].昆明理工大学学报(理工版),2004,29(4):214-217. 被引量:12
  • 3陈勇.钻石理论:区域发展新思路[J].财经科学,2004(6):34-37. 被引量:9
  • 4郭波,张涛,张泉,谭跃进.备件组合方案下的多阶段任务成功性评估模型[J].系统工程理论与实践,2005,25(2):94-100. 被引量:20
  • 5Bottcher J, Drexl A, Kolisch R. A branch and bound procedure for project scheduling with partially renewable resource constraints[C]. Proceedings of the 5th International Workshop on Project Management and Scheduling, Poznan, 1996, 4:48 - 51.
  • 6Brucker P, Drexl A, Mohring R, et al. Resource-constrained project scheduling: Notation, classification, models and methods[J]. European Journal of Operational Research, 1999, 112:3 -41.
  • 7Herroelen W, Reyck B D, Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments[J].Computers & Ops. Res,1998, 25(4) :279 - 302.
  • 8Kaplan L. Resource-constrained project scheduling with preemption of jobs[D]. Ann Arbor, MI:University of Michigan, 1988.
  • 9Jansen J, Ohring S. Approximation algorithms for time constrained scheduling[J]. Information and Computation, 1997,132: 85- 108.
  • 10Wybo Jean-Luc. FMIS: a decision support system for forest fire prevention and fighting[J]. IEEE Transactions on Engineering Management, 1998, 45(2) : 127 - 131.

共引文献63

同被引文献26

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部