摘要 广州地铁5号线大坦沙南~中山八站段采用盾构法施工,右线急转弯段曲率半径290m,左线210m,接近盾构的极限能力,施工困难。结合铰接装置、千斤顶、仿形刀等的应用,严格控制盾尾间隙和千斤顶行程差,考虑盾构姿态和隧道设计轴线,合理进行管片选型。并根据管片钟点特征计算管片选型导致的位置和角度改变量,明显改善了隧道工程施工质量。 Datansha south to Zhongshanba segment of Guangzhou Subway Line 5 is constructed with shield method.The right and left line radius of the sharp turning segment are 290m and 210m respectively,which are almost the limit shield.On basis of application of hinged devices,jacks and copying knife,tunnel tail gap and displacement difference of jacks are strictly controlled,and the tunnel selection should consider shield posture and designed axis.Furthermore,authors calculate installation position and angle change caused by tunnel segment selection,thus construction quality of the tunnel is significantly improved.
出处 《施工技术》 CAS 北大核心 2010年第9期47-49,共3页 Construction Technology
基金 衡阳市科技基金研究项目(2009KJ32)
关键词 隧道 急转弯段 盾构掘进 管片选型 tunnel sharp turning segment shield tunneling tunnel segment selection
  • 相关文献

参考文献4

二级参考文献14

  • 1吴远忠.盾构中折装置在小半径转弯施工中的应用[J].建筑施工,2005,27(7):34-35. 被引量:4
  • 2李翔.小半径曲线盾构掘进时管片破损分析[J].现代城市轨道交通,2006(6):47-48. 被引量:17
  • 3中铁二局股份有限公司.三线近距、斜交、小半径、大坡度地铁盾构法施工综合技术研究[R].成都:中铁二局股份有限公司,2007.
  • 4[1]Kazuhito Komiya,Kenichi Soga,Hirokazu Akagi,Toshiyuki Hagiwara ,Malcolm D Bolton.Finite element modelling of excavation and advancement process of a shield tunneling machine[J].Soils and Foundations.1999,39,(3): 37-52.
  • 5[2]Lin D G,Tseng C T,Phienwej N,Suwansawat S.3-D deformation analysis of earth pressure balance shield tunnelling in Bangkok subsoil[J].Journal of the southeast asian geotechnical society ,2002,13-27.
  • 6[4]Lee K M,Rowe R K.Finite element modeling of the three dimensional ground deformations due to tunneling in soft cohesive soils: Part II-Results[J].Computers and Geotechnics,1990,2(2): 111-138.
  • 7[5]Lee K M,Rowe R K,Lo KY.Subsid otunnelling.I.Estimating the gap parameter[J].Canadian Geo technical Journal,1992,29 : 929-940.
  • 8[6]Lee K M,Rowe R K,Lo K Y.Subsidence owing to unnelling (Ⅱ): Evaluztionof a prediction technique[J].Canadian Geotechnical Journal,1992,29:941-953.
  • 9[7]Lee K M.,Rowe R K.Finite element modeling of the three dimensional ground deformations due to tunneling in soft cohesive soils: Part I-Methods of analysis[J].Computers and Geotechnics,1990,2(2): 87-110.
  • 10[9]Mana A I ,Clough G W.Predicition of movements for braced cuts in clay[J].Journal of Geo technical Engineering Division ,1981 ,107 : 759-778.

共引文献102

同被引文献28

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部