摘要
汾河二库是我省境内较为理想的调峰、填谷、事故备用的抽水蓄能电站站址,开发汾河二库抽水蓄能电站有利因素诸多:优越的地理位置,有利的地形、地质条件,交通方便施工条件好,有可靠的水源保证。文章最后给出了电站建设的总体规划。
In this paper,the Fenhe Reservoir Ⅱ is thought to be an ideal site of developing the pumped storage power station used for hump modulation,emergency stand by and etc.in Shanxi Province as it has many advantages on geographic position,topographic and geologic condition,transportation facilities,construction condition and water source.Finally,the general planning building the station is briefly given.
出处
《山西水利科技》
1999年第1期25-26,共2页
Shanxi Hydrotechnics
关键词
抽水蓄能电站
汾河二库
总体规划
山西
水库
Pumped storage Power Station Fenhe Reservoir Ⅱ Advantage General Planning