期刊文献+

陕西省黄金峡水库泵站及电站厂房稳定分析

A stability analysis of reservoir pumping station and power plant working house on Shanxi gold gorge
下载PDF
导出
摘要 对黄金峡水库河床式泵站、坝后式电站厂房进行了整体的稳定及地基承载力分析,得出该河床泵站、坝后电站联合布置厂房在各种工况下均满足规范要求的结论,为泵站、电站联合布置提供了数据支持与依据。 It has an analysis of the stability and the bearing capacity of foundation on the gold reservoir like riverbed pumping station, dam-rear power station working house as a whole. It gets the conclusion which satisfies the standards under different working situations of the working house with arrangement by this riverbed put,aping station and dam-rear power station. To provide the data support and basis for the arrangement by pumping station and power plant.
作者 晏娅娅
出处 《山西建筑》 2010年第26期131-132,共2页 Shanxi Architecture
关键词 河床式电站厂房 稳定分析 地基承载力 荷载组合 riverbed power plant working house, stability analysis, bearing capacity of foundation, load combination
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部