摘要
从全装修住宅工程的设计控制、材料控制、施工工艺流程控制、施工过程质量控制等环节论述了如何通过全装修住宅工程过程质量控制模式来实现提高全装修住宅工程质量的方法措施,从而缩短工期,降低造价。
Starting from aspects of design control, material control, construction process control, and construction process quality control of fully furnished housing engineering and so on, it discusses measures on how to improve fully furnished housing project quality by fully furnished housing project process quality control, so as to shorten the construction period and to lower the cost.
出处
《山西建筑》
2010年第26期200-201,共2页
Shanxi Architecture
关键词
全装修住宅工程
过程质量控制
管理控制
fully furnished housing engineering, process quality control, management control