摘要
根据多年的工作经验,针对箱梁施工中存在的负弯矩波纹管定位、漏浆严重、压浆不饱满、张拉槽口后期封堵,以及锚垫板加强筋处理等问题,提出了相应的预防和处理措施,解决了箱梁施工的质量问题。
According to many-year experience, the paper according to the problems in the box girder construction, including the bellows location of the negative moment, the serious mud leakage, insufficient grouting, the blockage of the tension notch in post period, and the treatment of stiffener of pavement plate, and points out respective prevention and treatment measures, so as to solve the quality problems in the box girder construction.
出处
《山西建筑》
2010年第26期215-216,共2页
Shanxi Architecture
关键词
箱梁
负弯矩施工
波纹管
槽口
box girder, negative moment construction, bellows, notch