摘要
阐述了尊村浮船取水装置建设的理由及泵站脱流机理,分析了浮船运行情况及其优缺点,并根据灌区实际情况提出了三管齐下多口取水的方法,从而保证供水需求。
This paper describes reasons for building floating water installation in Zun village and pumps flow separation mechanism, analyzes the floating operation and its advantages and disadvantages. According to actual situation, it proposes a three-pronged multi-irrigation watermouth approach. Thus it ensures water supply needs.
出处
《山西建筑》
2010年第26期367-368,共2页
Shanxi Architecture
关键词
浮船取水装置
运行情况
优缺点分析
floating water installations, operation status, advantages and disadvantages analysis