摘要
矿山设计的目的在于确定开拓方式、选择一种或多种采矿方法回采矿石。其中一部分是采矿生产计划,包括采矿工作量、生产成本和预计的年收入。本文旨在利用所开发的计算机模型,对矿山设计的这些方面进行检验。这些模型可对连续矿体的单个或多个采场进行设计并完成经济分析。
The ultimate aim of a nine design is to determine the develompent work involved and resources required by adopting one or more specific altematives. A part of the production of mining plans/designs, an outline of the amount of work and costs involved as well as a prediction of the revenues expected. The paper aims to examine these aspects of mine design using the computer models developed. These models are capable of designing and performing economic analysis for one or more stopes for a continuous orebody.
关键词
采矿方法
选择
计算机
经济分析
mine design, computer modeling,economic analysis