摘要
针对矿山综合计划管理的特点及Excel5开发信息系统的功能,选用Excel5来进行矿山综合计划计算机管理系统的开发。在应用程序流程设计的基础上,进行了自定义界面的设计与实现,自定义函数库的建立和使用,引入和导出.dbf文件等设计开发,并在歪头山铁矿进行了开发应用。
In light of the characteristics of the mine comprehensive planning management and the Excel5's function in developing information systems,Excel5 was selected for the development of the computer management system of mine comprehensive planning.On the basis of the application flow design,the self defining interface was designed and realized,the self defining function library was established and used and the *.dbf file introduction and derivation were designed and developed,which were used in the system development for Waitoushan Iron Mine.
出处
《金属矿山》
CAS
北大核心
1999年第1期36-38,48,共4页
Metal Mine