摘要
采用实地调绘、航片判读、统计分析、历史类比与趋势外推相结合的方法,对平朔安家岭露天煤矿1998~2019年剧烈扰动的16520hm2的土地利用结构进行了预测性研究.结果表明,22a间,共剥离岩土1609800万m3,挖损土地12000hm2,压占土地4520hm2,其中,耕地和林牧用地分别消失8743hm2和790hm2.规划后的土地利用结构有了明显的改善,其中,耕地由原来的529%提高到707%;林牧用地由原来的48%提高到293%,基本消除了荒地和其它未利用地.同时,耕地总量动态平衡结果表明,以6a为耕地恢复期,大约在采矿26a后,耕地总量可达到平衡;若以10a为耕地恢复期,大约在采矿34a后,耕地总量可达到平衡.
Adopting the method of combining surveying and mapping on the spot,reading aerial
photograph,statistical analysis,historical analogy and inferring from trend,we predict the land
use structure of drastically disturbed mined land in AJL opencast coal mine of Pingshuo. The
result shows that there will be 1609 8 billion m3 of rock and soil being stripped off,1 2000hm2
of land being excavated and4520hm2 of land being covered during 19982019. Of the total
damaged land, there will be 8743 hm2 of arable land and 790hm2 of forest and grass land.
However,after reclamation planning,the land use structure will be improved remarkably. For
example, the rate of arable landand that of forest land and grassland will be lifted from the
original 529% and 48% to 707% and 293% respectively. Moreover, barren land and other
unused land will be removed by and large. At the same time,we predict the equilibrium of the
total amount of arable land in this area. The result shows that the total amount of areable land
in AJL Mine can reach equilibrium after 26 years since mining if the restoration stage is 6
years. That can only reach equilibrium after 34 years or so since mining if the restoration stage
is 10 years.
出处
《煤炭学报》
EI
CAS
CSCD
北大核心
1999年第2期207-211,共5页
Journal of China Coal Society
基金
"九五"国家重点科技攻关子专题
关键词
大型露天煤矿
土地利用结构
耕地总量动态平衡
预测
large opencast coal mine,land use structure,dynamic equilibrium of
arable land,prediction