摘要
以西安市财政干部培训中心工程为实例,论述了湿陷性黄土地区复杂场地地基处理方案的选择思路,介绍了该工程地基处理方案的选择过程,对湿软黄土场地的挤密孔回淤现象进行了机理探讨。
Taking the project of Xi'an Training Center of Finance Cadre as an example,an idea about selecting plans of ground treatment on intricate field in the collapsible loess district is expounded,the process of selecting plans of ground treatment in connection with the project of Xi'an Training Center of Finance Cadre is introduced.The reverse silting of the compacting hole on wet soft loess field is discussed tentatively in view of its mechanism.
出处
《西安建筑科技大学学报(自然科学版)》
CSCD
1999年第1期51-53,共3页
Journal of Xi'an University of Architecture & Technology(Natural Science Edition)