摘要
结合越南昆江2一级电站坝址区热带雨林的特殊气候条件和工程地质条件,详细介绍了该水电站碾压混凝土大坝的设计与施工。工程投运后,经20年一遇洪水的考验,大坝安全无恙。
The Vietnam Song Con 2 first-cascade hydropower station is located in tropical rain forest area with special climate and engineering geological conditions.A detained introduction was made on the design and construction of its RCC main dam.The main dam has withstood a flood of 20-year reoccurrence period since it was put into operation.
出处
《广西水利水电》
2010年第4期38-41,53,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
碾压混凝土
大坝
设计
施工
Roller compacted concrete(RCC)
main dam
design
construction