摘要
为提高龙门滩一级水电站自动化程度,结合水电站综合自动化改造要求,简介调速器、励磁系统、自动化测量元件和微机监控系统的选型改造、功能等。改造后投运10年效果良好。
The comprehensive automation system of Longmentan 1st-cascade Hydropower Station had been upgraded 10 years ago in order to enhance the automation level.A brief introduction was made on the selection,upgrade and function of governor,excitation system,automatic measuring elements,computer supervision and control system.The upgraded system has been operating well since it was put into use.
出处
《广西水利水电》
2010年第4期75-77,83,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
水电站
自动化
改造
系统
选型
功能
Hydropower Station
automation
upgrade
system
selection
function