摘要
以江西省山口岩水利枢纽工程碾压混凝土双曲拱坝施工为例,介绍了碾压混凝土的原材料及配合比试验方法,论述了全断面碾压混凝土施工的工艺流程、工序要点和质量控制措施。
Shankouyan Hydraulic Complex located in Jiangxi province is designed with a RCC double-curvature arch dam.Taking the construction of this dam as example,the authors introduce the raw materials of RCC and the testing methods of mix proportion,and discussed the program,main points of each procedure and quality control for construction of a full-section RCC dam.
出处
《广西水利水电》
2010年第4期86-89,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
碾压混凝土
双曲拱坝
施工技术
山口岩水利枢纽
Roller compacted concrete(RCC)
double-curvature arch dam
construction technology
Shankouyan Hydraulic Complex