摘要
高水头、小流量、长引水线路的电站,引水工程作为小型水电站的重要组成部分,其可靠性在设计中应予以足够的重视。本文通过对三个方案进行比较,最后确定采用全隧洞引水放案。该方案不仅能够切实保证工程安全可靠运行,且对环境保护和水土保持有利。
The water diversion system is an important part of the hydropower station with high-head,small flow and long water diversion line.The Reliability of water diversion system should be taken more attention to in designing.Through the comparation of three plans,the plan of whole tunnel drawing is adopted.This plan can not only make sure the engineering safely operation,but also be valuabe to the environment and water protect.
出处
《南水北调与水利科技》
CAS
CSCD
2010年第5期149-152,共4页
South-to-North Water Transfers and Water Science & Technology
关键词
引水系统
高水头
长引水线路
隧洞
water diversion system
high-head
long water diversion line
tunnel