摘要
榆林天然气处理厂接收榆林南区、子洲-米脂气田、第二净化厂来气共60亿立方米/年,原有的天然气放空系统一直未做改变,已不能满足目前的放空要求,通过分析榆林天然气处理厂天然气放空系统工艺存在的问题,核算目前火炬放空系统的放空能力,提出放空系统完善方案,对于提高处理厂的安全运行具有重要意义。
The natural gas plant of Yulin receives the gas from the southern area, zizhoumizhi gas field, the second purification plant 6 billion per year. With no modification since first established, the original gas venting system can no longer meet the actual gas blow-down requirements. The paper aims to propose a better solution by analyzing the existing problems in the venting system of yulin and calculating the capability of the current torch venting system, which is of important significance to the safe working of the plants.
出处
《石油化工应用》
CAS
2010年第9期34-39,79,共7页
Petrochemical Industry Application
关键词
放空系统
安全
完善
venting system
safe
perfect