期刊文献+

TBM施工隧洞塑性变形围岩的处理与监测分析 被引量:4

Treatment and monitoring of plastic deformation tunnel surrounding rock in TBM construction
下载PDF
导出
摘要 文章介绍了大伙房水库输水工程TBM1施工段26+960-27+691洞段围岩发生塑性变形、侵占设计断面的处理措施,同时设计布置了永久性监测仪器。通过对仪器采集数据等相关资料的科学分析,表明该段隧洞围岩处于稳定状态。 According to the plastic deformation and encroaching the design section for surrounding rock in 26+ 960-27+691 length of TBM1 construction for water conveyance project of Dahuofang reservoir, the paper introduces these treatment measures and designs and layouts the permanent monitoring instruments. By scientifically analyzing the collecting data on equipment and other related information, the result shows that the tunnel surrounding rock is stable.
出处 《东北水利水电》 2010年第9期7-9,27,共4页 Water Resources & Hydropower of Northeast China
关键词 TBM施工隧洞 塑性变形洞段 围岩处理 监测分析 TBM tunnel construction plastic deformation surrounding rock treatment monitoring analysis
  • 相关文献

参考文献2

共引文献27

同被引文献22

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部