摘要
华电芜湖电厂一期(2×660MW)工程中,升压站为500kV电压等级,采用121断路器接线。启备变接入1(1/2)断路器串中,这使得该工程启备变保护用电流互感器的配置不同于一般的变压器。本文通过计算分析,提出了启备变1(1/2)断路器接线中保护配置方案及电流互感器的选型。
1(1/2)circuit breaker connection of high voltage distribution device is used in the first phase of the project(2×660MW) of Huadian Wuhu Power Plant.The booster stations have 500kV voltage class.Startup/standby transformer is connected in 1(1/2) circuit breaker connection,which makes the relay protection and secondary wiring complicated.By computational analysis and engineering example,a relay protection and current transformer configuration of 1(1/2) circuit breaker connection are proposed in this paper.
出处
《安徽电气工程职业技术学院学报》
2010年第3期21-26,共6页
Journal of Anhui Electrical Engineering Professional Technique College
关键词
启备变
1(1/2)断路器接线
继电保护
电流互感器
startup/standby transformer
1(1/2) circuit breaker connection
relay protection
current transformer