期刊文献+

洞桩法隧道导洞施工拱顶与地表沉降分析

Analysis on vault and ground subsidence in the benching tunnel construction with cavern-pile method
下载PDF
导出
摘要 以某地铁站为基础建立了洞桩法隧道导洞施工的三维数值模型,探讨了导洞施工对导洞拱顶与地表沉降的影响,结果表明分期施工的导洞对拱顶与地表沉降存在相互影响,先开挖的比后开挖的最终沉降略大;现场实测沉降值通常比计算值大。 With a subway station as a base, it establishes three dimensional numerical model of benching tunnel construction with cavern-pile method. It has discussed the impacts of benching tunnel construction on drift vault and ground subsidence, and mutual impacts of stage con- struction drift on vault and ground subsidence. And then, it achieves that: final subsidence value of first-excavated comparing to last-excavat- ed, on-spot actual subsidence value is usually bigger than the predicted value.
作者 瞿万波
出处 《山西建筑》 2010年第28期335-336,共2页 Shanxi Architecture
关键词 洞桩法 导洞施工 拱顶沉降 地表沉降 cavern-pile method, benching tunneling method, vault subsidence, ground subsidence
  • 相关文献

参考文献5

二级参考文献24

共引文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部