期刊文献+

增设广义位移下箱梁剪力滞效应的变分法 被引量:9

Variational Method of Shear Lag Effect of Box Beams with Adding Generalized Displacement Assumptions
下载PDF
导出
摘要 考虑荷载横向移动时顶板、底板剪力滞效应的不同,及腹板剪力在剪切变形中做功效应的影响,根据以往学者得出的试验效果良好的三次抛物线型,分设不同的纵向位移函数,取4个独立的广义位移对箱梁的剪力滞效应进行分析.由最小势能原理,建立关于不同位移的微分方程及自然边界条件.公式演引过程表明,剪力滞效应与腹板剪切效应独立存在;求解结果表明,所演引的公式更符合实际结构应力及位移分布情况,具有较高的实用价值. The top plate and bottom plate of box beams behave different shear lag effects when the symmetric load moves along the cross section.The web shear's work on the shearing deformation is taken.Based on the previous research and conclusion on the shear lag effect experiment,cubic parabola displacement function is adopted.Considering the top and bottom plate's different longitudinal displacements,four independent generalized displacements are taken to analysis the shear lag of box beams.Based on the principle of minimum potential energy,displacement differential equations and natural boundary conditions are formed respectively.Formula derivation process shows that shear lag effect and web shear deformation work independently.The computation results indicate that the derivation formulas can improve calculation accuracy.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2010年第9期1276-1280,共5页 Journal of Tongji University:Natural Science
基金 国家"八六三"高技术研究发展计划资助项目(2007AA11Z103) 山东省交通科技资助项目(2007Y24)
关键词 箱梁 变分法 剪切变形 剪力滞效应 广义位移 box beams variational method shear deformation shear lag effect generalized displacements
  • 相关文献

参考文献6

  • 1Reissner E.Analysis of shear lag in box beams by the principle of minimum potential energy[J].Q App1 Math,1946,6(3):268.
  • 2郭金琼 房贞政(等).箱形梁桥剪滞效应分析[J].土木工程学报,1983,16(1):1-13.
  • 3Luo Q Z,Li Q S,Tang J.Shear lag in box girder bridges[J].Journal of Bridge Engineering,ASCE,2002,7(5):308.
  • 4Chang S T.Shear lag effect in simply supported prestressed concrete box girder[J].Journal of Bridge Engineering,ASCE,2004,9(2):178.
  • 5吴亚平,杨玫,周大为,林丽霞,苏强.荷载横向变位下箱梁顶板与底板的剪滞效应分析[J].土木工程学报,2007,40(10):8-12. 被引量:22
  • 6程翔云.梁桥理论与计算[M].北京:人民交通出社,1998.

二级参考文献8

  • 1张士铎,王文州.荷载横向作用位置对箱型梁剪力滞效应的影响[J].湖南大学学报(自然科学版),1995,22(2):109-115. 被引量:22
  • 2郭金琼.箱形梁剪力滞效应分析[J].土木工程学报,1983,16(1):1-12.
  • 3Reissner E.Analysis of shear lag in box beams by the principle of minimum potential energy[J].Q.Appl.Math.,1946,6(3):268-278
  • 4Moffatt K R,Dowling P J.Shear lag in steel box girder bridges[J].J.Struct.Engrg.,ASCE,1975,53:439-48
  • 5Foutch D A,Chang P C.A shear lass anomaly[J].J.Struct.Engrg.,ASCE,1982,108(7):1653-1658
  • 6Luo Q Z,Li Q S.Shear lag of thin-walled curved box girder bridges[J].J.Engrg.Mech.,ASCE,2000,126(10):1111-1114
  • 7Wu Yaping,Lai Yuanmiag,Zhu Yuanlin,et al.A curved box beam element considering shear lag effect and its static and it dynamic applications[J].Journal of Sound and Vibration,2002,253(5):1131-1139
  • 8Wu Yaping,Liu Shizhong,Zhu Yuanlin,et al.Matrix analysis of shear lag and shear deformation in thin-walled box beams[J].J.Engrg.Mech.,ASCE,2003,129(8):944-950

共引文献107

同被引文献92

引证文献9

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部