摘要
目前,35kV变电站的规模正向综合自动化的方向发展.文章根据这种变电站各级保护的整定值计算及现场运行的经验加以阐述.对35kV高压负荷隔离开关及高压熔断器配合选择在电网中的应用进行了探讨.
The scale of the 35kv transformer station are developing to a comprehensive automatic station.The paper explains the setting calculations at all levels substations protections and the experience of worksite operation.Furthermore discussing about the combining selection of hv load disconnected switches and hv fuses and applications of them on the power net
关键词
负荷隔离开关
熔断器
选择
应用
load disconnected switches
fuses fusing parts
selection
application