5Baumol, W. J, J. C Panzar and R. D. Willig (1982) , Contestable markets and the theory of industrial structure, Harcourt Brace Jovanovitch, San Diego.
6Bertoldi, P. , M. Renzio, J. Adnot andE. Vine (2003), "How EU ESCOs are behaving and how to create a real ESCO market'? "ECEEE 2003 Study - Time to turn down energy demand, France,European Council for a Energy Efficient Economy.
7Globerman, S. and A. R. Vining (1996) ,'A framework forevaluating the government contracting - out decision with an application to information technology', Public Administration Review, 56 (6) , 577- 584.
8Hansen, S.J. and J. C. Weisman (1998), Performance contracting: expanding horizons, Fairmont Press Inc., Lilburn.
9Irrek, W. , S. Thomas, S. Attali, G. Bemke, N. Borg, A.Figorski, M. Fillpowiz, N. Labanca, A. Pindar and A. Ochoa (2005) , Public internal performance contracting: managing and financing energy efficiency measures in public administrations',ECEEE 2005 Summer Study, Mandelieu, France, European Councilfor a Energy Efficient Economy.
10Leibenstein, H. ( 1966 ) , "Allocative Efficiency vs. X - Efficiency", American Economic Review, 56(June) , 392 -415.