《成本-进度控制系统准则》浅谈 被引量:4

DISCUSSION ON NORMS OF COST-SCHEDULE CONTROL SYSTEM
下载PDF
导出
摘要 介绍了在国外大型工程项目中广泛采用的美国《成本-进度控制系统准则》,包括业主和承包商建立统一的工作分解结构;成本和进度完成情况测量基准;分包、采购和间接费的管理;赢得值评估分析;项目跟踪报告制度及主要表格;承包商资格审查和批准等。通过实例详细说明了赢得值评估主要方法的应用。 The American' cost - schedule control system norms' which widely used in large - scale engineering pro- ject were introduced, including establishment of an unified work resolution structure between owner and contractor, determining reference for accomplishment of cost and schedule, management of subcontracting, purchasing and intermediate expenses, evaluation analysis of gaining value, project tracking report system and the main tables, examination and authorization of contractor seniority etc.. The application of the main methods for evaluation on gaining value were described in detail with practical example.
作者 李世柳
出处 《炼油设计》 1999年第4期45-50,共6页 Petroleum Refinery Engineering
关键词 工程项目 准则 投资 成本 速度控制系统 large-scale project, cost estimation, cost comparison, progress schedule, control, norm, contractor, investment cost
  • 相关文献

同被引文献7

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部